New Build: Trenching

|

September 2023

Hello and welcome to the blog! Today I am sharing about the new build! We got through the designing of the house, permits and grading. So now it’s time for trenching. They came and dug out all the footings. These trenches will get electrical and plumbing ran through them, as well as lots of rebar and concrete.

After the trenching they came and put in forms. The forms will help when they start to pour the concrete. It was neat to watch the beginning stages of the foundation. Can’t wait to share the foundation next! Be sure to subscribe to the blog so you don’t miss a post, and check out the latest New Build Youtube video!

Similar Posts